Lesson Learned: The Importance of Communication
By Kem Russell
Have you ever had someone not correctly follow or understand your instructions? I feel pretty safe in saying the answer is a 100% “Yes”. The failure to correctly follow communicated instructions may have been the fault of the instructor (how the information was or was not communicated), the person receiving the information (they didn’t understand, didn’t care, or both), or the fault of both the giver and receiver.
How we communicate, depending on the situation can be extremely important. Some of you may remember a famous quote stated in the 1967 movie “Cool Hand Luke”, staring Paul Newman. The statement is made by the prison camp Captain, “What we have here is, failure to communicate.”
We may think we are doing an outstanding job presenting our information and instructions. However, we should always consider how to improve our method and means of presenting information so there is not a “failure to communicate” and the intended information is properly transferred.
I remember a funny experience I had last winter while attempting to instruct a young boy on how to snow ski. As a ski instructor I had been assigned to teach this first time skier. My plan was to start by teaching him some very basic moves that would be helpful for as long as he ever skied. One of the first basic moves was a side step up a very gentle slope. While standing beside him I said, “Pick up your right foot and move it uphill.” I had to change my entire method of instruction and communication when he, very innocently said, “Which is my right foot?” His level of knowledge required me to think of a much different approach than teaching intermediate or advanced skiers.
I had to start at an even more basic level and teach him body awareness and where his body parts were in space. While growing up I often worked with my dad or one of his employees while modifying existing or constructing new refrigeration systems. As time passed I learned how to gas weld smaller line sizes. On one occasion while working on an ammonia system that was pumped out for modifications my dad quickly explained to me what I could do while he went to work on another part of the system.
There were several other lines in my work area, but I was confident of what to do so I started measuring, cutting pipe, and welding on fittings. I had just finished my work when my dad returned and looked at my work. “Well, son, those are good looking welds, and the lines look straight and level. The only issue I see is that you have the liquid line tied into the hot gas line.” The communication from my dad to me didn’t account for my lack of understanding of what lines were what or what they did.
Fortunately, the correction only took a short time. Our communication to someone needs to not just be clear but must consider their knowledge level and their understanding. For many people, their education and experience with ammonia refrigeration systems in design, construction, and operation and maintenance makes it seem very straight forward. Many others may not have that level of experience or understanding.
Recently I was again made aware of a lack of understanding of an important part of ammonia refrigeration systems. That part is the relief system. On-going communication, both written and verbal, should happen to increase the knowledge and understanding of designers, construction personnel, and system operator/maintenance personnel about relief systems.
In my experience, it is rare that I find a relief system (valves and discharge piping) that does not need some correction. The correction may be fairly minor, or a major change. For newer systems, built in the last 15 years or so, changes are typically minor.
Fortunately, there are many very helpful resources that can be used to guide us in design, construction and maintenance of relief systems. ANSI/IIAR 2 Standard for Design of Safe Closed-Circuit Ammonia Refrigeration Systems, Chapter 15 “Overpressure Protection” provides important and helpful information on the entire relief system, relief devices, and relief inlet and discharge piping. Another good source of information is the IIAR Refrigeration Piping Handbook, Chapter 6, “Piping for Pressure Relief Devices”. Other information can be found in several past
IIAR technical papers.
Depending on a person’s education and experience the information about relief valves and systems can be challenging to understand. A designer may have a proper relief system design but the person installing the relief system may not have the same depth of knowledge and understanding. How the relief system information is communicated as to what is intended and what is acceptable and not acceptable should be clearly understood.
The following are some examples of errors between the intended design and what gets installed that I have seen:
• The inlet connection of the relief device installed is larger than the relief connection size on the protected pressure vessels. The line or valve size between these two connection points may be larger, but the area of the inlet of the relief device is not to be larger than the area of the relief connection on the pressure vessel.
• The relief device discharge line size is smaller than the relief device outlet size. I am surprised when I find this, and it has not been a one-time occurrence. The size of the relief device discharge line can only be equal to or larger than the outlet size of the relief device.
• The relief device installed has much more flow capacity than needed. The relief discharge line capacity is sized on the calculated flow capacity of the relief device, taking into account the inlet pressure losses. I guess people think that a little is good and more would be better. Not so. Whatever the relief device flow capacity is, the associated relief discharge line size must accommodate that flow without creating excessive backpressure. A higher flow rate usually requires a larger line size to keep the valve backpressure below a determined limit. Also, the larger line size may
unnecessarily increase the system installation cost.
• Multiple relief devices connected into a common header and the main header size is either equal to or one size larger than the outlet of the largest relief device. On checking the relief discharge piping design, this improper sizing most often results in excessive backpressure so the relief devices will not function properly. The main header can be sized on what might simultaneously relieve, which should be based on good engineering judgment for the particular system. The main header could be designed to handle all relief devices discharging simultaneously which would be a conservative approach but may result in a much larger than needed main header size and added cost. Sizing the header for only the flow of the largest relief device may be too limiting on what might actually occur.
• The relief discharge piping is not properly connected resulting in the release of ammonia at a location(s) that could cause panic and/or serious injury. I have seen this several times.
Possibly it was forgotten that the entire relief discharge system must be securely connected? In one particular case an unconnected joint was found during an actual ammonia relieving event. The person trying to tighten up the leaking connection did not have the proper PPE to be protected. Fortunately, no one was injured but it could easily have gone the other way.
You may think of other relief system errors that you have experienced. Relief system design, proper construction, and correct maintenance are all very important, so that it can continue to function as a valuable safety system. How this information is clearly and accurately communicated can make a big difference.
The preceding has focused on the relief system, but all aspects of an ammonia system are important. Don’t have a “failure to communicate” and end up with an unhappy, if not disastrous situation.